LEARNING OUTCOME
1. To understand the role and responsibility of Contractor and Consultant Quantity Surveyor in the construction industry.
2. To understand the scope of work and professional bodies of quantity surveyor.
3. To understand and develop awareness of the provision of the Standard Contract form related to construction period.
4. To understand the tender and procurement methods in the construction industry.
5. To know how to prepare tender documents and progress payments.

GROUP ASSIGNMENT
This is a group assignment that requires students to analyse the different methods of tendering and procurement methods that are being practiced in the industry for a branch campus in Kota Kinabalu, Sabah. 

The three tendering methods discussed in my assignment are open tendering, selective tendering and negotiated tendering. On the other hand, the two procurement methods examined are traditional procurement and design & build procurement. After detailed analysis of each methods, my group member and I have proposed the design & build procurement method, with an selective tendering system for this project.


Taylor's Graduate Capabilities( TGC Values )
Picture
From this module, I have a better understanding of the role and duties of Quantity Surveyor as it provides an overall overview of professional and contractual responsibilities of a consultant and contractor quantity surveyor from  the design stage till the final account stage. I am also able to identify the roles of various parties that involved in construction industry and their construction contracts and contractual obligations. In addition, I have a better understanding on the preparation of the variation order, claim for extension of time and others. 

Picture
It also requires us to use ICT and related technologies effectively. This is because we 
had use books as well as the internet to search and find for relevant materials that is based
on each of our part in our assignment. ​
Picture
In this group assignment, it has also help me to ameliorate my thinking and problem solving skills. In this particular assignment, we were required to think creatively and critically in order to understand the types of tendering and procurement method that are commonly used in the industry and apply it into our proposed project of a branch campus in Kota Kinabalu, Sabah. 



No comments: