Friday 8 July 2016

Measurement 4 (QSB2125 / QSB60404)

Lecturer: Sr Loo Seong King

Learning Outcomes
1. Recognize the items measurable for bored piles, timber piles, steel piles, renovation and demolition works, and various external works.

​2. Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for bored piles, timber piles, steel piles, renovation and demolition works, and various external works.

3. Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender Documents for bored piles, timber piles, steel piles, renovation and demolition works, and various external works.

​4. Generate a conceptual understanding of and the ability to competently carry out the preparation of the Bills of Quantities for bored piles, timber piles, steel piles, renovation and demolition works, and various external works.

Measurement 4 group assignment 

In this assignment, our task is to imagine ourselves being a consultant QS for a project which includes the task to measure all elements of a double storey building including the production of the Bills of Quantities and culminating in the preparation of a set of Tender Documents for calling of tender.


Our project team,LKH Consultant Sdn. Bhd. is lead by Yee Algel followed by the other consultants, Lee Kit Hung, Bo Yong Khong, Yeoh Pooi Ching, Hoo Bung Jiat, Hazim Aziz and I, Lai Choon Feng. We are required to prepare a tender document for the Cadangan Membina Rumah Satu Unit Banglo Dua Tingkat Jenis

Summervale Type C Di Bandar Akademia, Mukim Lenggeng, Daerah Seremban Negeri Sembilan Darul Khusus.



Element Cost Analysis ( ECA )

During the elemental cost analysis week ( ECA week ), we are required to attend ECA workshop where a group of up to 10 students will prepare detail cost analysis of a building project culminating in the preparation of a ECA report.

Taylor's Graduate Capabilities( TGC Values )
Picture
In this assignment, we were required to put theories that we have learnt during the lectures and tutorials into practice as we having the ability to interpret the clauses in the Standard Method of Measurement ( SMM ) in definitely a necessity for the various trades in relation to the measurement of bored piles, timber piles, steel piles, renovation and demolition works, and various elements of external works. 
Picture
Besides that, this assignment, also allow us to develop and reinforce our thinking and problem solving skills by thinking critically in order for us to overcome each hurdles that we faced while accomplishing the project. For instance, we were required to assume some of the misinterpretation and undefined information in the plan given by using relevant substitutes. 
Picture
Since this is a group assignment, communication skills and cooperation between the members is definitely essential. As a future quantity surveyor, there will definitely be a lot of projects and tendering involvement. Henceforth, communication is key to prevent any disputes between any other construction players such as, the client, architect, engineers, contractor and sub-contractor.




No comments:

Post a Comment